Ships detained in Paris MoU region in December 2020


Due to technical issues this list was not based on release date, but on detention date. The lists are from now on again based on the release date.

The number of times a ship has been detained during a 24 month period is because of the NIR (New Inspection Regime) now a 36 month period and is included in the list.

In general, a ship is not released from detention before all necessary repairs have been made. However, sometimes it is not possible to repair all defects at the place of detention. Therefore, a detained ship may be allowed to sail to a repair yard without really being released from detention. In the list those cases are marked by the sentence ‘Ship allowed to sail to nearest repair yard for repairs’.

Find the list herebelow:

Paris MoU list



Source link

Leave A Reply

Your email address will not be published. Required fields are marked *